New Delhi- Ashutosh Gangal, General Manager Northern Railway held a review meeting with the departmental heads and DRMs of Northern Railway. Deliberations were held on keeping focus on Train Operations, Punctuality, Freight loading and Safety on tracks.
Gangal informed that, for achieving optimum utilization of rolling stock in freight movement Northern railway runs 970 CRACK trains between 11.08.2022 to 17.08.2022 and more such trains will be operated. He emphasized on better crew management and utilization of man power.
He instructed to maintained good record of punctuality of trains and expedites the works related with mobility enhancement and conducting drives to check the progress. He reviewed the work done over the zone in improving the maintenance standard of track, welds and removal of scrap lying near the tracks. The GM also took stock of the tree cutting activity and removal of vegetation alongside the tracks.
Gangal emphasized upon minimizing the human failure in train operation, extensive monitoring of rail fractures and rail welds and said no error should be left. He asked the officers should enhance their inspection to assess the progress of works as well as train operations.
He also informed that, loading of food grains & other items have steadily increased with every passing month.
Northern Railway is committed to provide safe, smooth and efficient services to its customers.
Follow this link to join our WhatsApp group: Join Now
Be Part of Quality Journalism |
Quality journalism takes a lot of time, money and hard work to produce and despite all the hardships we still do it. Our reporters and editors are working overtime in Kashmir and beyond to cover what you care about, break big stories, and expose injustices that can change lives. Today more people are reading Kashmir Observer than ever, but only a handful are paying while advertising revenues are falling fast. |
ACT NOW |
MONTHLY | Rs 100 | |
YEARLY | Rs 1000 | |
LIFETIME | Rs 10000 | |