The department has deployed engineers at macadam plants and in the field for quality control mechanism of macadam. And in this backdrop, 12 tippers of macadam were rejected from a plant holder in south Kashmirs Pulwama.
Chief Engineer Public Works department, Abdul Hameed told KNS that the newly appointed assistant engineers have been assigned to check quality of macadam and they have been fanned out at macadam plants and in the field.
Quality checking laboratories have been set up at macadam plants and in the field where the engineers check the quality of macadam. 12 tippers were today rejected by the department after the macadam was found deficient in Bitumen chemical by the engineers in the lab in Pulwama, Hameed told KNS.
It saved the department Rs 5 lakh. Also, the plant holder has been given a notice and if he repeats his plant will be blacklisted, the CE said.
The department was censured by public for using sub standard material in road construction and pavement of macadam. Complaints would galore that the macadam does not last long, and the department would blame the winters for it.
However, the Chief Engineer said that the department on the directions of the minister Naeem Akhtar has issued strict directions for maintaining quality control mechanism.
It is for the first time that a plant holder has been warned. The department wont tolerate errors and sub standard material, he said.
Follow this link to join our WhatsApp group: Join Now
Be Part of Quality Journalism |
Quality journalism takes a lot of time, money and hard work to produce and despite all the hardships we still do it. Our reporters and editors are working overtime in Kashmir and beyond to cover what you care about, break big stories, and expose injustices that can change lives. Today more people are reading Kashmir Observer than ever, but only a handful are paying while advertising revenues are falling fast. |
ACT NOW |
MONTHLY | Rs 100 | |
YEARLY | Rs 1000 | |
LIFETIME | Rs 10000 | |